Bathroom remodel
Tomas Czodor project in September 2023 This complete bathroom remodeling involved demolition of old bath tub and transformation to walking shower with sliding shower door. After plumbing and electrical work we was able to install insulation, hardiebecker with RedGard waterproofing. This steps was followed by fixing some drywall, spraying new texture, priming, painting and installation of all tiles on floors and walls. Client chose all materials to their preference with my design of tile layout. After grouting of all tiles and apply sealer, same time we installed cabinet with 2 sinks and countertop. During remodel we was able to install mirrors, toilet and other items to complete the job for satisfaction of my client. Job took me 3.5 weeks. www.gorgeouspainting.com #bathroom #remodeling #construction