Posts

Bathroom remodel

Image
Tomas Czodor project in January 2024 This complete bathroom remodeling involved demolition of old bath tub and transformation to walking shower. First plumbing  - new shower valve and drain was installed, followed by hot mop, hardiebecker with RedGard/waterproofing. After these steps project continued: fixing of some drywall and smoothing, texturing, priming, painting and installation of all tiles on floors and walls. Client chose all materials to their preference with my design of tile layout. During remodel we was able to install mirror, new lights, bathroom exhaust fan, new toilet and other items to complete the job for satisfaction. www.gorgeouspainting.com #remodeling #tiles

Exterior woodwork and painting

Image
  Tomas Czodor project in November 2024 This was project of woodwork and exterior painting on the fourth house on the same street for my old client who was very satisfied with my previous jobs. As for woodwork my company change many facia boards, handrail boards, stair step, wood moldings, rafter tails and new gate with wooden post. In the storage shed behind the house we changed one whole wall of 2x4s and plywood because of rot. During the job was changed one light, new house number light box, hinges on the screen door. We used high quality Dunn Edwards wood primer and Eversheild paints. www.gorgeouspainting.com #remodeling #painting

Interior & exterior painting

Image
Tomas Czodor project in September 2024 In the end of May I received phone call from client whom my company paint his exterior of the house over ten years ago. He still had old paint cans what I used that time and it was 2012 year on them. Client wanted use exactly same colors and products as before. After exterior painting, this time client wanted to paint interior as well. My company painted all walls, ceilings, doors, baseboards, crown moldings and cabinets. During the interior painting we also renovate his fireplace with new drywall, tiles and painting of the metal curtain. www.gorgeouspainting.com #remodeling #painting

Replacement of sub panel

Image
Tomas Czodor project in August 2024 As a license general contractor we providing variety of services like in this case replacing of sub panel with new brakes for client who needed to fix the issue before the one bedroom apartment could be sold and pass the inspection. On the same job we change bathroom exhaust fan what didn't work and accomplished other small handyman tasks. www.gorgeouspainting.com #electrical

Exterior painting and woodwork

Image
Tomas Czodor project in July 2024 In the end of June I received phone call from client who living in Old Towne Orange and own 110 years old house. He said that I did fabulous job few years ago near by and he seen whole process of detail preparation and painting off the house on the way to church every week. He took a picture of mine sign on the front of the house. This was complete exterior painting and some minor woodwork. Nearly 2 weeks we spent on the sanding by various power tools for wooden siding, eaves and porch. That was followed by priming with special wood primer, patching and caulking. Once that was done we used Benjamin Moore paints what was purchased by client on all woodwork - siding, eaves, fascias and windows and stain product on coating for deck.  www.gorgeouspainting.com #exteriorpainting #woodwork

Exterior woodworking and painting

Image
Tomas Czodor project in May 2024 During this project in South Orange County my company removed roof from the patio, replaced some rotten wood 2x4s, 2x6s, 1x1s, one whole post and lattice. Patio was sanded, patched by bondo and caulked. All patio was primed and also all new wood was primed before installation and painted 2 times with Dunn Edwards semigloss exterior paint. During the job stucco was fixed on one wall and this wall was fully painted (one what facing the pool). www.gorgeouspainting.com #exteriorpainting #woodwork

Exterior staining and varnishing

Image
  Tomas Czodor project in April 2024 This exterior staining/varnishing of two gates was job my company performed in lovely gated community of Dove Canyon.  Gates was fully sanded to remove old varnish, cleaned, stained and 4 coats of gloss marine Epifanes varnish was applied. Between coats 24 hours. Job took 4 days (2 full days and 2 partial days) due to drying of the varnish. www.gorgeouspainting.com #exteriorvarnishing