Bathroom remodel
Tomas Czodor project in January 2024
This complete bathroom remodeling involved demolition of old bath tub and transformation to walking shower. First plumbing - new shower valve and drain was installed, followed by hot mop, hardiebecker with RedGard/waterproofing. After these steps project continued: fixing of some drywall and smoothing, texturing, priming, painting and installation of all tiles on floors and walls. Client chose all materials to their preference with my design of tile layout. During remodel we was able to install mirror, new lights, bathroom exhaust fan, new toilet and other items to complete the job for satisfaction.
www.gorgeouspainting.com
#remodeling #tiles
Comments
Post a Comment