Bathroom remodel

Tomas Czodor project in September 2020


This complete remodeling involved new tiles on walls and floor and around bath tub. Old bath tub had to be removed and reinstalled after tiles was in place. Old leak from bath tub was fixed. We installed also toilet, plumbing for all 4 sinks, shower and 2 countertops - one in master bathroom and one in hallway bathroom. Last thing was repainting walls and cabinets with installation of transitions.





www.gorgeouspainting.com







#construction #remodeling


Comments

Popular posts from this blog

Bathroom remodel

Interior & exterior painting

Exterior painting & plaster repair