This complete bathroom remodeling involved demolition of old bath tub and transformation to walking shower. After plumbing new shower valve and drain work was done and hardiebecker with RedGard waterproofing.was installed. This steps was followed by fixing some drywall and smoothing, priming, painting and installation of all tiles on floors and walls. Client chose all materials to their preference with my design of tile layout. After grouting of all tiles and apply sealer on grout, same time we installed cabinet. During remodel we was able to new install mirror, reinstall old toilet and other items to complete the job for satisfaction of my client. Job took me 3.5 weeks.