Posts

Kitchen remodeling

Image
Tomas Czodor project in December 2020 This complete remodeling of kitchen took me 2 months and included demo of old kitchen, reparation of framing with drywall work, new sofit, electric, plumbing, kitchen cabinets, flooring with baseboards, installation of appliances, installation of new window and painting.   www.gorgeouspainting.com #construction #remodeling

Exterior painting & woodwork

Image
Tomas Czodor project in November 2020 This complete exterior painting - siding, frames around windows and replacing of all white edge vertical and horizontal boards I started in April. Delivering 100s of ln feet of boards on the job site was followed by painting all boards with primer and 2 coats of finish paints from all sides. That was followed by installation, patching of nail holes, sanding and caulking and complete repainting of boards again. After few months we had to wait for window company to finish and fabricate more than 50 windows. My company returned at the house and finished painting of the siding. www.gorgeouspainting.com #construction #remodeling #exteriorpainting

Exterior painting & remodeling

Image
Tomas Czodor project in October 2020 This complete exterior painting and replacement of damaged wood on the house was my main work in summer 2020. House is from 1905 and all boards what was changed have to be ordered or custom milled to match old boards as best as it was 115 years ago when house was newly builded. This house is signed in Historic part of Old town Orange. After power washing and sanding by power tools we discovered many areas where wood needs to be replaced. It took few weeks to order right materials and couple weeks for replacement. All wood was primed before installation and all sanded wood was primed as well. Once that was done we used Aristoshield Dunn Edwards paints on all woodwork - siding, eaves, fascias and windows. We was able fabricated one window for laundry room and replace entire siding on back of the building. Window what my company fabricated exactly match all old 115 years old windows. Customer was extremely satisfied by work that she hired me f...

Bathroom remodel

Image
Tomas Czodor project in September  2020 This complete remodeling involved new tiles on walls and floor and around bath tub. Old bath  tub  had to be removed and reinstalled after tiles was in place. Old leak from bath tub was fixed. We installed also  toilet, plumbing for all 4 sinks, shower and 2 countertops - one in master bathroom and one in hallway bathroom. Last thing was repainting walls and cabinets with installation of transitions. www.gorgeouspainting.com #construction #remodeling

Bathroom remodel

Image
Tomas Czodor project in August 2020 This month we remodeled pool bathroom. This complete remodeling involved new tiles on walls and floor, toilet, plumbing, smoothing walls after removal of wall paper, painting, new cabinet  with  lighting, mirror and fan. Customer after this bathroom remodeling hired me for next bathroom later in the year after they will obtain all parts for it.  www.gorgeouspainting.com #construction #remodeling

Bathroom remodel

Image
Tomas Czodor project in Jul 2020 In Jun I finished guest bathroom remodeling and right after I was hired and started master bathroom remodeling for same client.   This project I designed as well constructed. 3 glass tile streaks in the middle of the walls presenting waterfall. This complete master bathroom remodeling  involved removing wall between toilet and vanity, new shower with a seating, drainage, plumbing, new tiles on the walls and on the floor, texturing, painting, new cabinet with new lighting and mirror.  Customer after this master bathroom remodel hired me for additional painting around the house. www.gorgeouspainting.com #construction #remodeling #tilewaterfall

Bathroom remodel

Image
Tomas Czodor project in Jun 2020 This project I designed as well constructed. Complete guest bathroom remodeling involved new bath tub installation, drainage, plumbing, new tiles on the walls and on the floor, texturing, painting, new cabinet with new lighting and mirror.  Customer after this guest bathroom remodel hired my company also for master bathroom remodel what made me happy and showing quality of our work. www.gorgeouspainting.com